Pengadaan dan pemasangan IBT 2 500 KV, GITET GRATI

  • Location : Grati, Pasuruan
  • Year : 2011
  • Owner : PT. PLN (Persero) P3B Region Jawa Timur dan Bali
  • Workscope : Pondasi Trafo dan Area sekitar Trafo


Erection, Testing & Commissioning for 17 Power Transformer

  • Location : Variable
  • Year : 2011
  • Owner : PT. CG Power Indonesia
  • Workscope : Assembling (Erection) and testing Commissioning Power Transformer for various area.


Contract for Erection and commissioning of Electrical Equipments for 150 kV Ulubelu Geothermal Power Plant (2X55MW) Project

  • Location : Lampung - Sumatera
  • Year : 2011
  • Owner : PT. Siemens Indonesia
  • Workscope : Construction Substation include testing and commissioning.


Construction of Interconnection 20 kV Conductor Cable plant Tidore - Ternate (KSO Mardika: PT. Mardika Sarana Engineering, PT. KMI Wire, PT. Yalagada Surya)

  • Location : Ternate - Tidore
  • Year : 2009
  • Owner : PT. PLN
  • Workscope : Submarine Cable installation through Ternate, tidore and Maitara Island


150 kV Kamojang Substation

  • Location : Garut – West Java
  • Year : 2007
  • Owner : PT. Rekayasa Industri / ABB Transmission & Distribution
  • Workscope : Steel Structure, Outdoor Equipment, LV & Control Cable, Panel & Metering, Testing & Commissioning