| Pengujian Tangen Delta dan Sfra 1250KVA, 3000KVA, 30MVA PT. Teknologi Yudha Pratama Rp. 32,500,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 25 September 2025 - On Going |
| Pengujian Tangen Delta dan Sfra 1250KVA, 3000KVA, 30MVA PT. Teknologi Yudha Pratama Rp. 32,500,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 25 September 2025 - On Going |
| Test Oli Trafo DGA 1 Sample PT. Karya Sentosa Teknik Rp. 1,500,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 22 September 2025 - On Going |
| Test Oli Trafo DGA 2 Sample PT. Karya Sentosa Teknik Rp. 3,000,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 17 September 2025 - Finish |
| TAR25 Battery Test Of CT2 PT. Gresik Power Indonesia Rp. 8,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 11 September 2025 - Finish |
| Test Oli Trafo (DGA & BDV) 2 Sample PT. Multi Energytama Rp. 3,800,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 22 August 2025 - Finish |
| Power Transformer PT. Graha Usaha Teknik Rp. 142,000,000 | Maintenance | KALIMANTAN SELATAN - KABUPATEN TABALONG | 19 August 2025 - On Going |
| Test Oli Trafo DGA 3 Sample PT. Hamparan Rejeki Utama Rp. 4,200,000 | Uji Lab | JAWA TIMUR - KABUPATEN MOJOKERTO | 13 August 2025 - Finish |
| Pemeliharaan Panel Kubikel 20kV & Test DGA 1000kVA PT. Quality Works Rp. 6,400,000 | Maintenance | JAWA TIMUR - KABUPATEN LAMONGAN | 07 August 2025 - On Going |
| Purifikasi Oli Trafo 1600KVA & Test DGA 1 Unit - Pasuruan PT. Adiprima Buana Bakti Rp. 9,000,000 | Maintenance | JAWA TIMUR - KABUPATEN PASURUAN | 06 August 2025 - Finish |
| Maintenance Dry Transformer Cooling Tower MCC & Mobilisation Demobilisation PT. Linde Indonesia Rp. 61,000,000 | Maintenance | BANTEN - KOTA CILEGON | 29 July 2025 - Finish |
| Test Oli Trafo DGA 1 Sample plus Mob Demob Manyar Gresik PT. Agung Buana Sentosa Rp. 1,750,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 24 July 2025 - On Going |
| Pengujian Tangen Delta dan Sfra 500KVA (Include Operator) PT. Teknologi Yudha Pratama Rp. 10,000,000 | Testing & Commissioning | JAWA TENGAH - KABUPATEN BLORA | 18 July 2025 - Finish |
| Test Oli Trafo DGA 7 Sample PT. Karya Sentosa Teknik Rp. 10,500,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 15 July 2025 - Finish |
| Test Oli Trafo BDV 1 Sample CV. Ilham Irfan Abadi Rp. 400,000 | Uji Lab | JAWA TIMUR - KABUPATEN MOJOKERTO | 11 July 2025 - Finish |
| Treatment Oli Trafo 3 Unit PT. Weltes Energi Nusantara Rp. 22,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 10 July 2025 - Finish |
| Treatment Oli Trafo 1600KVA, Cubicle Cleaning, Test DGA, dan Test BDV PT. Hokkan Deltapack Industri Rp. 6,300,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 10 July 2025 - On Going |
| Transformer oil purification PT. Freeport Indonesia Rp. 127,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 07 July 2025 - Finish |
| Test Oli Trafo (DGA & BDV) 1 Sample PT. Multi Daya Mitra Rp. 1,900,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 01 July 2025 - Finish |
| Test Oli Trafo DGA 1 Sample PT. Karya Sentosa Teknik Rp. 1,500,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 26 June 2025 - On Going |
| Jasa Oli Trafo Excitation Transformer Fortune Electric PT. Graha Usaha Teknik Rp. 25,000,000 | Maintenance | JAWA TENGAH - KABUPATEN JEPARA | 20 June 2025 - On Going |
| Test Oli Trafo DGA 1 Sample PT. Karya Sentosa Teknik Rp. 1,500,000 | Uji Lab | DKI JAKARTA - KOTA JAKARTA PUSAT | 18 June 2025 - Finish |
| Test Oli Trafo (DGA dan Water Content) 4 Sample PT. Multi Daya Mitra Rp. 7,600,000 | Uji Lab | JAWA TIMUR - KOTA MALANG | 16 June 2025 - Finish |
| Test Oli Trafo DGA 3 Sample PT. Karya Sentosa Teknik Rp. 4,500,000 | Uji Lab | JAWA BARAT - KOTA BOGOR | 04 June 2025 - Finish |
| Supporting Technician for Testing before & after completion Rockwell Automation Rp. 35,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 20 May 2025 - On Going |
| Sewa DILO Machine SF6 Gas Handling Mega Series Lokasi Bangil PT. Hasta Prajatama Rp. 350,000,000 | Sewa Alat | JAWA TIMUR - KABUPATEN PASURUAN | 16 May 2025 - Finish |
| Test Oil Tegangan Tembus Maintank OLTC 2 Sample & Test DGA 1 Sample PT. Emdeki Utama Rp. 2,500,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 12 May 2025 - On Going |
| Gearbox and Hydraulic Oil Analysis 20 Sample PT. Siemens Gamesha Renewable Energy Rp. 80,000,000 | Uji Lab | DKI JAKARTA - KOTA JAKARTA SELATAN | 25 April 2025 - On Going |
| Test Oli Trafo DGA 2 Sample CV. Teknologi Berjaya Rp. 2,800,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 22 April 2025 - On Going |
| Jasa Oli Trafo Purification Lokasi Jepara PT. Graha Usaha Teknik Rp. 75,000,000 | Maintenance | JAWA TENGAH - KABUPATEN JEPARA | 22 April 2025 - Finish |
| Test Oli Trafo DGA 2 Sample PT. Gansar Jaya Rp. 3,000,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 21 April 2025 - On Going |
| Test Oli Trafo (DGA, BDV, dan Water Content) 1 Sample PT. Multi Daya Mitra Rp. 3,000,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 21 April 2025 - On Going |
| Test Oli Trafo DGA 2 Sample PT. Karya Sentosa Teknik Rp. 3,000,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 17 April 2025 - Finish |
| Test Oli Trafo DGA 3 Sample PT. Karya Sentosa Teknik Rp. 4,500,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 14 April 2025 - Finish |
| Test Oli Trafo DGA 3 Sample PT. Hamparan Rejeki Utama Rp. 4,200,000 | Uji Lab | JAWA TIMUR - KOTA MADIUN | 09 April 2025 - Finish |
| Hipot Test & Primary Injection Breaker 500A PT. Sumur Batu Rp. 7,000,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 09 April 2025 - Finish |
| Test Oli Trafo DGA 2 Sample PT. Qianna Jaya Tehnik Rp. 3,000,000 | Uji Lab | BALI - KABUPATEN TABANAN | 27 March 2025 - Finish |
| Test Oli Trafo DGA 2 Sample PT. Anabati Kharisma Mulia Rp. 2,800,000 | Uji Lab | JAWA TIMUR - KOTA PASURUAN | 24 March 2025 - On Going |
| Test Oli Trafo (DGA, BDV, dan Water Content) 2 Sample PT. Multi Daya Mitra Rp. 6,000,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 24 March 2025 - On Going |
| Test Oli Trafo DGA 2 Sample PT. Bromelain Enzyme Rp. 3,000,000 | Uji Lab | LAMPUNG - KABUPATEN LAMPUNG TENGAH | 18 March 2025 - Finish |
| Test Oli Trafo DGA 1 Sample CV. Teknologi Berjaya Rp. 1,400,000 | Uji Lab | BALI - KABUPATEN BADUNG | 17 March 2025 - Finish |
| Test Oli Trafo DGA 1 Sample PT. Anabati Kharisma Mulia Rp. 1,400,000 | Uji Lab | JAWA TIMUR - KABUPATEN PASURUAN | 17 March 2025 - Finish |
| Pekerjaan Filtrasi Oli beserta perbaikan kebocoran seal packing sisi Sekunder Low Voltase (LV) Trafo 1600kVA The Via & The Vue Apartments Rp. 7,500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 17 March 2025 - On Going |
| Sewa Mesin Purifier dan tangki 8000 liter PT. Hasta Karya Perdana Rp. 30,000,000 | Pengadaan | JAWA TIMUR - KABUPATEN SIDOARJO | 05 March 2025 - Finish |
| Test Oli Trafo DGA 1 Sample CV. Teknologi Berjaya Rp. 1,400,000 | Uji Lab | BALI - KABUPATEN BADUNG | 04 March 2025 - Finish |
| Test Oli Trafo BDV 14 Sample PT. Pancaran Suara Citra Rp. 1,260,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 04 March 2025 - Finish |
| Test Oli Trafo DGA 3 Sample PT. Pancaran Suara Citra Rp. 4,800,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 03 March 2025 - Finish |
| Test Oli Trafo BDV 2 Sample The Via & The Vue Apartments Rp. 400,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 28 February 2025 - Finish |
| Test Oli Trafo DGA 8 Sample CV. Teknologi Berjaya Rp. 11,200,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 25 February 2025 - On Going |
| Power Transformer PT. Graha Usaha Teknik Rp. 160,000,000 | Maintenance | KALIMANTAN SELATAN - KABUPATEN TABALONG | 21 February 2025 - Finish |
| Test Oli Trafo PCB 1 Sample PT. Hamparan Rejeki Utama Rp. 2,100,000 | Uji Lab | JAWA TIMUR - KABUPATEN MOJOKERTO | 21 February 2025 - On Going |
| Test Oli Trafo DGA 3 Sample PT. Karya Sentosa Teknik Rp. 4,500,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 21 February 2025 - On Going |
| Jasa Purifikasi Trafo 800 kVA dan pengisian Oil Volume 50.000/liter PT. Golden Cendana Jaya Rp. 5,650,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 18 February 2025 - On Going |
| CWP Stop Log Structure Assessment PT. Cirebon Electric Power Rp. 194,943,750 | Civil | JAWA BARAT - KABUPATEN CIREBON | 18 February 2025 - Finish |
| Distribution Transformer PT. Graha Usaha Teknik Rp. 10,000,000 | Maintenance | KALIMANTAN SELATAN - KABUPATEN TABALONG | 14 February 2025 - Finish |
| Test Oli Trafo DGA 1 Sample CV. Teknologi Berjaya Rp. 1,400,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 22 January 2025 - On Going |
| Test Oli Trafo DGA 8 Sample PT. Multi Energytama Rp. 12,000,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 20 January 2025 - Finish |
| Provide material/spare part and tools to do OLTC inspection/maintenance work PT. Cirebon Energi Prasarana Rp. 2,142,062,000 | Maintenance | JAWA BARAT - KABUPATEN CIREBON | 13 January 2025 - On Going |
| Replacement & Commissioning Panel 20kV PT. Ispat Wire Products Rp. 65,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 09 January 2025 - On Going |
| Test Oli DGA & Water Content 2 Sample PT. Multi Daya Mitra Rp. 3,800,000 | Uji Lab | JAWA TIMUR - KOTA MALANG | 08 January 2025 - Finish |
| Test Oli Trafo DGA 1 Sample PT. Jaya Abadi Energy Rp. 1,500,000 | Uji Lab | JAWA TIMUR - KABUPATEN SIDOARJO | 30 December 2024 - Finish |
| Hipot Test 1 Jalur Bapak Budi Slamet Rp. 2,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN KEDIRI | 27 December 2024 - On Going |
| Test Oli Trafo DGA 2 Sample CV. Ready Tech Rp. 3,000,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 24 December 2024 - On Going |
| Test Oli Trafo DGA 3 Sample CV. Teknologi Berjaya Rp. 4,200,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 16 December 2024 - On Going |
| Sewa Crimping Tools 800mm untuk terminasi ukuran kabel 800mm 1 hari PT. Sentratek Metalindo Rp. 2,000,000 | Sewa Alat | JAWA TIMUR - KABUPATEN GRESIK | 13 December 2024 - Finish |
| Test Oli Trafo BDV 1 Sample Gereja Citraland Surabaya Rp. 250,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 11 December 2024 - Finish |
| Test Oli Trafo (DGA & BDV) 2 Sample PT. Emdeki Utama Rp. 4,200,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 09 December 2024 - Finish |
| Test Oli Trafo DGA 3 Sample PT. Gansar Jaya Rp. 4,500,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 02 December 2024 - Finish |
| Jasa Trafo IBT 500kV 3 Unit PT. Hasta Prajatama Rp. 260,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 28 November 2024 - On Going |
| Repair kebocoran isolator trafo, penambahan oli dengan treatment oli trafo PLN PG630kVA PT. PG Gorontalo Rp. 26,000,000 | Maintenance | GORONTALO - KABUPATEN GORONTALO | 26 November 2024 - Finish |
| Test Oli Trafo DGA 8 Sample PT. Ispatindo Rp. 15,200,000 | Uji Lab | JAWA TIMUR - KABUPATEN SIDOARJO | 12 November 2024 - On Going |
| Test Oli Trafo BDV 1 Sample PT. The Master Steel Manufactory Rp. 400,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 29 October 2024 - On Going |
| Jasa Top up, Replacement, Purifikasi & Conservator Check GSUT PT. Graha Usaha Teknik Rp. 120,000,000 | Maintenance | KALIMANTAN TENGAH - KOTA PALANGKA RAYA | 28 October 2024 - Finish |
| Pengujian Oil Transformer BDV 1 Sample PT. Etika Dairies Indonesia Rp. 250,000 | Uji Lab | JAWA TIMUR - KOTA PASURUAN | 24 October 2024 - Finish |
| Test Oli Trafo DGA 2 Sample PT. Gansar Jaya Rp. 3,000,000 | Uji Lab | JAWA TIMUR - KABUPATEN MOJOKERTO | 22 October 2024 - On Going |
| Filtrasi Trafo 3 Unit dan Cubicle Maintenance 5 Unit Bapak Arif Gagah Prasetyo Rp. 22,550,000 | Maintenance | JAWA TIMUR - KABUPATEN TULUNGAGUNG | 22 October 2024 - Finish |
| Test Oli Trafo DGA 2 Sample PT. Multi Energytama Rp. 3,000,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 10 October 2024 - Finish |
| Pengadaan dan Pemasangan PM 5350 PT. Sarana Karya Utama Rp. 7,251,000 | Pengadaan | JAWA TIMUR - KABUPATEN GRESIK | 10 October 2024 - On Going |
| Purification 4 Trafo Kariangau PT. Graha Usaha Teknik Rp. 310,000,000 | Maintenance | KALIMANTAN TIMUR - KOTA BALIKPAPAN | 04 October 2024 - On Going |
| Maintenance Trafo 1 (1600kVA) PT. Adiprima Buana Bakti Rp. 14,900,000 | Maintenance | JAWA TIMUR - KABUPATEN PASURUAN | 27 September 2024 - On Going |
| Offline Oil Filtration 2 Trafo 40/50MVA & 100MVA (DGA, BDV, Water Content, dan PPM) PT. Ispatindo Rp. 58,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 25 September 2024 - Finish |
| Test Oli Trafo DGA 1 Sample CV. Teknologi Berjaya Rp. 1,400,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 24 September 2024 - On Going |
| Treatment Oli Purification Trafo PT. Graha Usaha Teknik Rp. 22,000,000 | Maintenance | JAWA TENGAH - KABUPATEN JEPARA | 23 September 2024 - On Going |
| Test Oli Trafo (DGA & Furan) 25 Sample PT. Gansar Jaya Rp. 100,000,000 | Uji Lab | JAWA TIMUR - KABUPATEN MOJOKERTO | 19 September 2024 - Finish |
| Test Oli Trafo 1 Sample (Test Colour & PPM) PT. Hamparan Rejeki Utama Rp. 800,000 | Uji Lab | JAWA TENGAH - KABUPATEN SEMARANG | 16 September 2024 - Finish |
| Testing and commissioning for protection relay of BMPP for 10 days PT. Hitachi Sakti Energy Indonesia Rp. 14,250,000 | Testing & Commissioning | SULAWESI TENGGARA - KABUPATEN KOLAKA | 11 September 2024 - Finish |
| Sewa Anti Twist PT. Hasta Prajatama Rp. 60,000,000 | Sewa Alat | LAMPUNG - KOTA METRO | 10 September 2024 - Finish |
| Test Oli Trafo DGA 1 Sample CV. Teknologi Berjaya Rp. 1,400,000 | Uji Lab | BALI - KOTA DENPASAR | 08 September 2024 - Finish |
| Test Tan Delta 4 Unit PT. Elektrindo Utama Indonesia Rp. 16,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 31 August 2024 - Finish |
| Jasa Survey Megger PT. Safila Arta Nugraha Rp. 1,500,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 30 August 2024 - Finish |
| Treatment Trafo Offline 2000kVA PT. Sinarindo Megantara Rp. 4,800,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 29 August 2024 - Finish |
| Sewa Crimping Tools 800mm untuk terminasi PT. Sentratek Metalindo Rp. 2,000,000 | Sewa Alat | JAWA TIMUR - KABUPATEN GRESIK | 28 August 2024 - On Going |
| Treatment Trafo Offline 1000kVA PT. Palunesia Makmur Rp. 3,000,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 28 August 2024 - Finish |
| Offline Oil Filtration Trafo No. 11 & 20 (DGA, BDV, Water Content, dan PPM) PT. Ispatindo Rp. 9,502,126 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 26 August 2024 - Finish |
| Pekerjaan Trafo IBT 500kV IBT #2 Krian PT. Abadi Technology Terbaik Rp. 510,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 26 August 2024 - Finish |
| Treartment Oli Trafo/Purifiying 1480 Liter 1500kVA PT. Sinar Angkasa Rungkut Rp. 2,750,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 21 August 2024 - On Going |
| Test Oli Trafo DGA 1 Sample CV. Teknologi Berjaya Rp. 1,400,000 | Uji Lab | JAWA TIMUR - KABUPATEN MALANG | 19 August 2024 - Finish |
| Purifikasi Trafo Sekolah Ciputra Sekolah Ciputra Rp. 6,000,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 05 August 2024 - On Going |
| Treartment Oil & Test DGA 3 Trafo (1600kVA, 2000kVA, dan 2500kVA PT. Sorini Towa Berlian Corporindo Rp. 15,000,000 | Maintenance | JAWA TIMUR - KABUPATEN PASURUAN | 02 August 2024 - Finish |
| Test Commisioning Low Voltage 9 day PT. Trimitra Buana Engineering Rp. 103,500,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 29 July 2024 - On Going |
| Test Oli Trafo DGA 1 Sample CV. Teknologi Berjaya Rp. 1,400,000 | Uji Lab | BALI - KABUPATEN TABANAN | 29 July 2024 - Finish |
| Test Oli Trafo BDV 1 Sample PT. Master Steel Manufactory Rp. 400,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 28 July 2024 - On Going |
| Test Oli Trafo BDV 1 Sample PT. The Master Steel Manufactory Rp. 400,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 28 July 2024 - On Going |
| Test Oli Trafo DGA 3 Sample CV. Teknologi Berjaya Rp. 2,800,000 | Uji Lab | JAWA TIMUR - KABUPATEN MALANG | 26 July 2024 - Finish |
| Test Oli Trafo DGA 1 Sample CV. Teknologi Berjaya Rp. 1,400,000 | Uji Lab | BALI - KABUPATEN BADUNG | 24 July 2024 - Finish |
| Test Oli Trafo DGA 1 Sample CV. Teknologi Berjaya Rp. 1,400,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 16 July 2024 - Finish |
| Test Oli Trafo DGA 1 Sample PT. Multi Daya Mitra Rp. 1,500,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 16 July 2024 - Finish |
| Low Voltage Switchgear (LVSWG) 4953-SWG (Relay protection & ACB) 9 panel PT. Trimitra Buana Engineering Rp. 60,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 15 July 2024 - Finish |
| Test Oli Trafo DGA 1 Sample CV. Teknologi Berjaya Rp. 1,400,000 | Uji Lab | JAWA TIMUR - KOTA MALANG | 10 July 2024 - Finish |
| Test Oli Trafo DGA 22 Sample PT. Master Steel Manufactory Rp. 118,800,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 09 July 2024 - Finish |
| Test Oli Trafo 2 Sample (Test Colour & Moesture) PT. Hamparan Rejeki Utama Rp. 1,600,000 | Uji Lab | JAWA TENGAH - KABUPATEN SEMARANG | 08 July 2024 - Finish |
| Test Oli Trafo DGA 1 Sample CV. Teknologi Berjaya Rp. 1,400,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 04 July 2024 - Finish |
| Repair & Filtration of Transformer No.18 & 29, DGA,PPM, BDV PT. Ispatindo Rp. 22,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 28 June 2024 - Finish |
| Precommissioning Trafo 6,6kV di HSB, FMR (winding, megger, dan test report) 2 unit PT. Trimitra Buana Engineering Rp. 9,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 27 June 2024 - Finish |
| Sewa Anti Twist Ø18mm 12 hasbel - 2 Bulan PT. Hasta Prajatama Rp. 60,000,000 | Sewa Alat | SUMATERA UTARA - KOTA MEDAN | 14 June 2024 - On Going |
| MV Cable (E-Room to EDG) 2 jalur & Hipot PT. Trimitra Buana Engineering Rp. 9,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 12 June 2024 - Finish |
| Low Voltage Switchgear (LVSWG) 3720-SWG and 3720-MCC (Relay protection and ACB) PT. Trimitra Buana Engineering Rp. 56,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 10 June 2024 - Finish |
| Test Oli Trafo DGA 5 Sample CV. Teknologi Berjaya Rp. 7,000,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 10 June 2024 - Finish |
| Test Oli Trafo DGA 2 Sample PT. Ispat Wire Products Rp. 3,000,000 | Uji Lab | JAWA TIMUR - KABUPATEN SIDOARJO | 10 June 2024 - On Going |
| Purifikasi Palangkaraya PT. Graha Usaha Teknik Rp. 83,000,000 | Maintenance | KALIMANTAN TENGAH - KOTA PALANGKA RAYA | 31 May 2024 - Finish |
| Precommissioning Trafo Distribution (3720-XFR-2000 dan 3720-XFR-2002) 2 unit PT. Trimitra Buana Engineering Rp. 9,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 31 May 2024 - Finish |
| MV Cable (E-house to HSB) 2 jalur & Hipot PT. Trimitra Buana Engineering Rp. 9,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 29 May 2024 - On Going |
| Transformer Testing Bayung Lencir PT. Graha Usaha Teknik Rp. 760,000,000 | Maintenance | SUMATERA SELATAN - KABUPATEN MUSI BANYUASIN | 28 May 2024 - Finish |
| Test Oli Trafo DGA 2 Sample CV. Teknologi Berjaya Rp. 2,800,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 22 May 2024 - On Going |
| Test Oli Trafo (DGA & BDV) 5 Sample PT. Wahana Lestari Investama Rp. 9,750,000 | Uji Lab | DKI JAKARTA - KOTA JAKARTA BARAT | 17 May 2024 - On Going |
| Sewa Montage Roll "Single" 1 Minggu PT. Persada Indah Muda Rp. 750,000 | Sewa Alat | JAWA TIMUR - KOTA SURABAYA | 14 May 2024 - Finish |
| Test Oli Trafo (DGA & BDV) 4 Sample PT. Emdeki Utama Rp. 3,900,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 14 May 2024 - On Going |
| Supply Manpower, Consumables, and tools including inspection and testing GSUT, UAT, IPB, NPB, Excitation, PLTA & GCB Outage PT. Graha Usaha Teknik Rp. 194,000,000 | Testing & Commissioning | KALIMANTAN TENGAH - KOTA PALANGKA RAYA | 08 May 2024 - Finish |
| Test Oli Trafo DGA 2 Sample (1250kVA & 2500kVA) PT. Jaya Abadi Energy Rp. 3,000,000 | Uji Lab | JAWA TIMUR - KABUPATEN SIDOARJO | 07 May 2024 - Finish |
| Jasa Oli Trafo Purification Trafo Rectifier 12 Unit PT. Graha Usaha Teknik Rp. 75,000,000 | Maintenance | JAWA TENGAH - KABUPATEN JEPARA | 22 April 2024 - On Going |
| Precommissioning Cubicle 6,6 kV 16 Panel PT. Trimitra Buana Engineering Rp. 192,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 16 April 2024 - Finish |
| Pengujian sebelum dan sesudah Cleaning - 5 Feeder (Tahanan Resistance, Keserempakan, Megger) PT. Bintang Timur Utama Sejahtera Rp. 65,000,000 | Maintenance | JAWA TIMUR - KABUPATEN MALANG | 16 April 2024 - Finish |
| Hipot DC Kabel Panel ke Trafo 2 Tarikan PT. Trimitra Buana Engineering Rp. 9,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 16 April 2024 - On Going |
| Test Oli Trafo DGA 9 Sample CV. Teknologi Berjaya Rp. 12,600,000 | Uji Lab | JAWA TIMUR - KABUPATEN GRESIK | 15 April 2024 - Finish |
| Maintenance 150 Bay, maintenance Bay Trafo 150kV, maintenance Kubikel 20kV, dan Lifting penggantian bushing tembok Fasa S PT. Multi Energytama Rp. 167,200,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 04 April 2024 - On Going |
| Purifikasi Oli Trafo 1000kVA secara offline PT. Easterntex Rp. 3,500,000 | Maintenance | JAWA TIMUR - KOTA PASURUAN | 04 April 2024 - Finish |
| Treatment Oli Trafo 2000kVA & 2500kVA PT. Pancaran Suara Citra Rp. 6,712,500 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 01 April 2024 - Finish |
| Maintenance 150kV yard substation PT. Ispatindo Rp. 65,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 26 March 2024 - On Going |
| Test Oli Trafo (DGA, BDV, dan Water Content) 2 Sample PT. Multi Daya Mitra Rp. 4,800,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 26 March 2024 - On Going |
| Purifikasi Oli 555kVA & Cleaning Cubicle PT. Multi Makmur Rp. 6,270,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 22 March 2024 - On Going |
| Test Oli Trafo DGA 1 Sample CV. Teknologi Berjaya Rp. 1,400,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 20 March 2024 - Finish |
| Test Oli Trafo DGA 5 Sample CV. Teknologi Berjaya Rp. 7,000,000 | Uji Lab | BALI - KABUPATEN BADUNG | 15 March 2024 - Finish |
| Test Oli Trafo DGA 2 Sample PT. Hamparan Rejeki Utama Rp. 2,800,000 | Uji Lab | JAWA TIMUR - KOTA PASURUAN | 14 March 2024 - Finish |
| Treartment Oil Trafo 1600kVA (online) dan penambahan Oli Trafo 50L PT. Penamas Nusaprima Rp. 10,000,000 | Maintenance | JAWA TIMUR - KOTA MALANG | 13 March 2024 - Finish |
| Test Oli Trafo DGA 1 Sample PT. Bambang Djaja Rp. 1,350,000 | Uji Lab | JAWA TIMUR - KABUPATEN SIDOARJO | 13 March 2024 - Finish |
| Test Oli Trafo DGA 1 Sample PT. Dinar Sinergi Solusi Rp. 1,350,000 | Uji Lab | JAWA TIMUR - KABUPATEN SIDOARJO | 07 March 2024 - Finish |
| Test Oli Trafo BDV 14 Sample PT. Pancaran Suara Citra Rp. 1,398,600 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 29 February 2024 - Finish |
| Commissioning CT 150kV PT. Ispatindo Rp. 42,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN SIDOARJO | 22 February 2024 - Finish |
| Test Oli Trafo DGA 1 Sample PT. Hamparan Rejeki Utama Rp. 1,400,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 09 February 2024 - Finish |
| Maintenance Trafo 1 (1600kVA) & 2 (2500kVA) PT. Adiprima Buana Bakti Rp. 21,650,000 | Maintenance | JAWA TIMUR - KABUPATEN PASURUAN | 06 February 2024 - On Going |
| Test Oli Trafo DGA 2 Sample CV. Teknologi Berjaya Rp. 2,800,000 | Uji Lab | JAWA TIMUR - KOTA BLITAR | 06 February 2024 - Finish |
| Treatment Oli Trafo 1000kVA SDF 2024 & Cleaning Cubicle PT. DHL Supply Chain Rp. 8,545,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 24 January 2024 - On Going |
| Test Oli Trafo DGA 1 Sample PT. Multi Daya Mitra Rp. 1,500,000 | Uji Lab | JAWA TIMUR - KOTA SURABAYA | 24 January 2024 - Finish |
| Pulling Cable PT. Tiga Pilar Energi Rp. 650,000,000 | Construction | JAWA TIMUR - KABUPATEN GRESIK | 15 January 2024 - Finish |
| Inspeksi Infrared Thermograph Panel Listrik 250 titik PT. Pancaran Suara Citra Rp. 8,750,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 15 January 2024 - On Going |
| Test DGA oli trafo PT. Glory Electric Indonesia Rp. 1,500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 27 November 2023 - On Going |
| Test SFRA, Bongkar Accessories Trafo, Assembling, Treatment, Vacuum Oil Trafo di GI Sumbawa PT. Hasta Prajatama Rp. 280,000,000 | Electrical | NUSA TENGGARA BARAT - KABUPATEN SUMBAWA | 24 November 2023 - Finish |
| Test DGA oli trafo PT. Bambang Djaja Rp. 1,350,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 23 November 2023 - On Going |
| Test DGA oli trafo CV. Ready Tech Rp. 1,500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 23 November 2023 - On Going |
| Test DGA oli trafo PT. Multi Daya Mitra Rp. 1,500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 20 November 2023 - On Going |
| Test DGA oli trafo PT. Bambang Djaja Rp. 6,050,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 20 November 2023 - On Going |
| Test DGA oli trafo PT. Glory Electric Indonesia Rp. 1,500,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 09 November 2023 - Finish |
| Test DGA oli trafo PT. Glory Electric Indonesia Rp. 1,500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 09 November 2023 - Finish |
| Test DGA oli trafo PT. Bambang Djaja Rp. 1,350,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 08 November 2023 - Finish |
| Test SFRA Trafo 2x100 MVA dan 1x50 MVA PT. Elektra Solusi Indonesia Rp. 15,000,000 | Testing & Commissioning | SUMATERA UTARA - KABUPATEN TAPANULI UTARA | 08 November 2023 - Finish |
| Test DGA oli trafo PT. Gansar Jaya Rp. 1,500,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 07 November 2023 - Finish |
| Test Oil Trafo (DGA, Water Content ) PT. Multi Daya Mitra Rp. 1,900,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 06 November 2023 - Finish |
| Test DGA oli trafo & Water Content PT. Multi Daya Mitra Rp. 1,900,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 06 November 2023 - Finish |
| Pekerjaan Treatment Oil Transformer Distribusi 6/0,4 kV dan 6/0,38 kV PT. PG Gorontalo Rp. 87,500,000 | Maintenance | GORONTALO - KABUPATEN GORONTALO | 03 November 2023 - Finish |
| Revitalisasi Listrik dan Perbaikan Hydrant PMK Lantamal IX Rp. 8,244,018,919 | Electrical | MALUKU - KOTA AMBON | 30 October 2023 - Finish |
| Oil Purification Transformer Gedung Keuangan Negara Indrapura Rp. 8,325,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 14 October 2023 - Finish |
| Jas Perbaikan Pompa PT. Pompa Dex Indoguna Rp. 10,000,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 11 October 2023 - Finish |
| Treatment Oil Transforme 500 kV PT. Graha Usaha Teknik Rp. 250,000,000 | Maintenance | JAWA TIMUR - KABUPATEN PROBOLINGGO | 09 October 2023 - On Going |
| Perbaikan & Retrofit Panel Kapasitor Trafo Distribusi PT. Berlian Jasa Terminal Indonesia Rp. 372,000,000 | Electrical | JAWA TIMUR - KOTA SURABAYA | 09 October 2023 - On Going |
| Treatment Trafo 2000 kVA (online), Cleaning & Maintenance Cubicle PT. Sibelco Minerals Rp. 7,500,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 04 September 2023 - Finish |
| Test DGA oli trafo PT. Laros Multi Indoteknik Rp. 1,500,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 04 September 2023 - Finish |
| Treatment Oil dan Cleaning Cubicle PT. Hokkan Deltapack Industri Rp. 6,300,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 01 September 2023 - Finish |
| Filterisasi oli trafo 600 kVA PT. Tri Samsu Teknik Rp. 3,000,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 23 August 2023 - On Going |
| Sewa Mesin Vacuum CV. Sarana Teknik Rp. 20,000,000 | Sewa Alat | JAWA TIMUR - KOTA SURABAYA | 18 August 2023 - Finish |
| Test DGA oli trafo & Water Content PT. Bambang Djaja Rp. 3,500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 15 August 2023 - Finish |
| Services for Oil Purification Transformer Drain Filling Oil Transformer PT. Elektrindo Utama Indonesia Rp. 15,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 12 August 2023 - Finish |
| Services for Oil Purification Transformer Drain Filling Oil Transformer PT. Elektrindo Utama Indonesia Rp. 60,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 12 August 2023 - Finish |
| Calibration Relay PT. Gresik Gases Indonesia Rp. 72,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 11 August 2023 - Finish |
| CT and OLTC Testing Trafo 33/6.9 kV - 20 MVA PT. Elektrindo Utama Indonesia Rp. 27,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 05 August 2023 - Finish |
| Test DGA oli trafo PT. Sorini Towa Berlian Corporindo Rp. 16,200,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 04 August 2023 - Finish |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Bambang Djaja Rp. 8,000,000 | Maintenance | JAWA TENGAH - KABUPATEN BANJARNEGARA | 04 August 2023 - Finish |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Bambang Djaja Rp. 8,000,000 | Maintenance | SUMATERA SELATAN - KOTA PALEMBANG | 04 August 2023 - Finish |
| Test DGA oli trafo PT. Jatim Taman Steel Rp. 1,800,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 01 August 2023 - Finish |
| Oil Purifier LV Trafo 6.6/0.42 kV PT. Elektrindo Utama Indonesia Rp. 121,440,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 24 July 2023 - On Going |
| Jasa Oil Purifier LV Trafo 6.6/0.42 kV PT. Elektrindo Utama Indonesia Rp. 121,440,000 | Electrical | JAWA TIMUR - KABUPATEN GRESIK | 24 July 2023 - On Going |
| Jasa Oil Purifier LV Trafo 33/6.9 kV PT. Elektrindo Utama Indonesia Rp. 75,680,000 | Electrical | JAWA TIMUR - KABUPATEN GRESIK | 24 July 2023 - On Going |
| Oil Purification Transformer (offline) PT. Ispatindo Rp. 5,401,440 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 18 July 2023 - Finish |
| PM for NGR PT. Gresik Power Indonesia Rp. 39,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 17 July 2023 - Finish |
| Test DGA oli trafo PT. Bambang Djaja Rp. 1,350,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 12 July 2023 - Finish |
| Test DGA oli trafo PT. Bambang Djaja Rp. 1,350,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 12 July 2023 - Finish |
| Test DGA oli trafo PT. Bambang Djaja Rp. 1,350,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 12 July 2023 - Finish |
| Test DGA oli trafo PT. Bambang Djaja Rp. 1,350,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 12 July 2023 - Finish |
| Check Tegangan Tembus 2500 kVA dan DGA PT. Hokkan Deltapack Industri Rp. 2,000,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 11 July 2023 - Finish |
| PM MCC ASU & BOILER MCC, 400 V PT. Gresik Power Indonesia Rp. 117,500,000 | Electrical | JAWA TIMUR - KABUPATEN GRESIK | 26 June 2023 - On Going |
| PM for Boiler Transformer PT. Gresik Power Indonesia Rp. 24,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 26 June 2023 - On Going |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Multi Daya Mitra Rp. 6,900,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 26 June 2023 - On Going |
| Test DGA oli trafo PT. Emdeki Utama Rp. 3,900,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 22 June 2023 - On Going |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Multi Daya Mitra Rp. 5,600,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 22 June 2023 - On Going |
| Oil Purification Transformer Rectifier PT. Graha Usaha Teknik Rp. 25,000,000 | Maintenance | JAWA TENGAH - KABUPATEN JEPARA | 21 June 2023 - On Going |
| Treatment , BDV, XFRA, Winding Resistance, Tan Delta, Ratio, Function PT. Hasta Prajatama Rp. 75,000,000 | Electrical | JAWA TIMUR - KABUPATEN SIDOARJO | 20 June 2023 - Finish |
| Treatment , BDV, XFRA, Winding Resistance, Tan Delta, Ratio, Function PT. Hasta Prajatama Rp. 75,000,000 | Electrical | JAWA TIMUR - KABUPATEN SIDOARJO | 20 June 2023 - Finish |
| Treatment Oil Transforme & Testing PT. Elektrindo Utama Indonesia Rp. 154,000,000 | Electrical | JAWA TIMUR - KABUPATEN GRESIK | 08 June 2023 - Finish |
| Oil Purification Trafo Rectifier PT. Graha Usaha Teknik Rp. 110,000,000 | Maintenance | DKI JAKARTA - KOTA JAKARTA PUSAT | 05 June 2023 - Finish |
| Oil Purification Transformer PT. Graha Usaha Teknik Rp. 178,000,000 | Electrical | JAWA TIMUR - KABUPATEN GRESIK | 27 May 2023 - On Going |
| Oil Purification Transformer PT. Elektrindo Utama Indonesia Rp. 178,000,000 | Electrical | JAWA TIMUR - KABUPATEN GRESIK | 27 May 2023 - On Going |
| Service for oil purification Transformer PT. Elektrindo Utama Indonesia Rp. 178,000,000 | Electrical | JAWA TIMUR - KABUPATEN GRESIK | 27 May 2023 - On Going |
| Jasa Oil Purifier LV Trafo 6.6/0.42 kV PT. Elektrindo Utama Indonesia Rp. 53,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 27 May 2023 - On Going |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Bambang Djaja Rp. 2,000,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 05 May 2023 - Finish |
| Test DGA oli trafo PT. Ispatindo Rp. 3,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 31 March 2023 - On Going |
| Test DGA oli trafo CV. Mundung Daya Engineering Rp. 4,600,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 27 March 2023 - On Going |
| Test DGA oli trafo CV. Jaya Elektrik Rp. 2,900,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 20 March 2023 - Finish |
| Oil Purification Transformer 630 kVA Universitas Ciputra Rp. 9,000,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 19 March 2023 - Finish |
| Treatment Oil Trafo 1000 kVA CV. Jaya Elektrik Rp. 2,750,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 18 March 2023 - Finish |
| Test DGA oli trafo PT. Bambang Djaja Rp. 1,350,000 | Maintenance | JAWA TIMUR - KABUPATEN PASURUAN | 14 March 2023 - Finish |
| Test DGA oli trafo PT. Pancaran Suara Citra Rp. 3,000,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 14 March 2023 - Finish |
| Maintenance Trafo 1600 kVA dan 2500 kVA CV. Abadi Buana Powerindo Rp. 19,525,000 | Maintenance | JAWA TIMUR - KABUPATEN PASURUAN | 13 March 2023 - Finish |
| Main Electrical Work of CJ BIO PA8 Project PT. CJI Pasuruan Rp. 1,569,000,000 | Electrical | JAWA TIMUR - KABUPATEN PASURUAN | 09 March 2023 - On Going |
| Maintenance GI 150 kV Substation PT. Ispatindo Rp. 65,000,000 | Electrical | JAWA TIMUR - KABUPATEN SIDOARJO | 09 March 2023 - Finish |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Bambang Djaja Rp. 8,000,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 08 March 2023 - Finish |
| Test DGA oli trafo PT. Bambang Djaja Rp. 1,350,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 28 February 2023 - On Going |
| Test DGA oli trafo PT. Bambang Djaja Rp. 1,350,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 28 February 2023 - On Going |
| Test DGA oli trafo PT. Jaya Abadi Energy Rp. 3,000,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 27 February 2023 - On Going |
| Rental Gas Handling PT. Hitachi Sakti Energy Indonesia Rp. 308,000,000 | Sewa Alat | SULAWESI SELATAN - KOTA MAKASSAR | 15 February 2023 - Finish |
| Test DGA oli trafo PT. Bambang Djaja Rp. 4,050,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 13 February 2023 - Finish |
| Pengujian Tan Delta20 kV RST PT. EXABB Energy Nusantara Rp. 57,000,000 | Maintenance | JAWA BARAT - KABUPATEN BEKASI | 08 February 2023 - Finish |
| Test DGA oli trafo PT. Laros Multi Indoteknik Rp. 1,350,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 03 February 2023 - Finish |
| Treatment Oil Trafo 140 kVA PT. Minepower Rp. 20,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 02 February 2023 - Finish |
| Test BDV Trafo 14 unit PT. Pancaran Suara Citra Rp. 1,050,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 17 January 2023 - Finish |
| Maintenance Panel & Trafo Cleaning, Pengadaan Meter PT. Mega Karya Makmur Rp. 15,000,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 13 January 2023 - On Going |
| Treatment Oil Trafo Vena Energy Jeneponto Rp. 11,000,000 | Maintenance | DKI JAKARTA - KOTA JAKARTA SELATAN | 30 December 2022 - On Going |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Siemens Gamesha Renewable Energy Rp. 9,000,000 | Maintenance | DKI JAKARTA - KOTA JAKARTA SELATAN | 26 December 2022 - On Going |
| Treatment Oil Trafo PT. Safila Arta Nugraha Rp. 3,750,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 22 December 2022 - On Going |
| Treatment Oil Trafo PT. Warugunung Industry Rp. 6,000,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 01 December 2022 - Finish |
| Treatment Oil Trafo PT. Coronet Crown Pharmaceutical Rp. 7,500,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 26 November 2022 - On Going |
| Treatment Oil Trafo 630 kVA & 400 kVA Bank Permata Tunjungan Rp. 6,660,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 19 November 2022 - Finish |
| Treatment Oil Trafo PT. Eterna Galliaria Prospera Rp. 730,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 17 November 2022 - Finish |
| Treatment Oil Trafo 800 kVA RS Mata Undaan Rp. 4,000,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 13 November 2022 - Finish |
| Sewa Alat PT. Hasta Prajatama Rp. 15,000,000 | Electrical | JAWA TIMUR - KABUPATEN SIDOARJO | 09 November 2022 - Finish |
| Test DGA oli trafo PT. CJI Pasuruan Rp. 26,436,000 | Maintenance | JAWA TIMUR - KABUPATEN PASURUAN | 07 November 2022 - Finish |
| Treatment Oil Trafo DHL Rungkut SIER Rp. 8,300,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 05 November 2022 - Finish |
| Purifikasi Trafo PT. Sukses Bersama Kencana Satya Rp. 15,000,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 25 October 2022 - On Going |
| Test Relay F22 PT. Gresik Power Indonesia Rp. 16,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 11 October 2022 - Finish |
| Maintenance GI 150 kV Substation PT. Ispatindo Rp. 47,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 03 October 2022 - Finish |
| Maintenance Electrical & Cleaning PT. Enha Duta Econsindo Rp. 10,500,000 | Electrical | JAWA TIMUR - KABUPATEN GRESIK | 30 September 2022 - On Going |
| Sewa Peralatan Penunjang Stringing SUTT 150 kV PT. Hasta Karya Perdana Rp. 180,000,000 | Electrical | JAWA TIMUR - KOTA SURABAYA | 26 September 2022 - On Going |
| Instalasi Wiring dan Terminasi Gerbong KAI PT. Daya Raya Cipta Rp. 6,000,000 | Construction | JAWA TIMUR - KOTA SURABAYA | 26 September 2022 - On Going |
| Test DGA oli trafo PT. Jatim Taman Steel Rp. 2,250,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 21 September 2022 - On Going |
| Treatment Oil Trafo PT. Ispatindo Rp. 39,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 14 September 2022 - Finish |
| Test DGA oli trafo PT. Hokkan Deltapack Industri Rp. 1,665,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 14 September 2022 - Finish |
| Test DGA oli trafo PT. Hokkan Deltapack Industri Rp. 1,500,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 14 September 2022 - Finish |
| Test DGA oli trafo PT. Umas Jaya Agrotama Rp. 3,000,000 | Maintenance | DKI JAKARTA - KOTA JAKARTA PUSAT | 09 September 2022 - Finish |
| Tan Delta PT. Graha Usaha Teknik Rp. 16,000,000 | Maintenance | KALIMANTAN SELATAN - KOTA BANJARMASIN | 07 September 2022 - Finish |
| Test BDV Trafo PT. Hokkan Deltapack Industri Rp. 500,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 05 September 2022 - Finish |
| Test BDV & DGA PT. Hokkan Deltapack Industri Rp. 500,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 05 September 2022 - Finish |
| Test DGA oli trafo PT. Bromelain Enzyme Rp. 1,500,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 21 August 2022 - On Going |
| Treatment Oil Trafo 800 kVA Graha Bhumiputera 1912 Rp. 3,000,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 20 August 2022 - Finish |
| PM Equipment 150 kV PT. CJI Pasuruan Rp. 330,000,000 | Maintenance | JAWA TIMUR - KABUPATEN PASURUAN | 19 August 2022 - Finish |
| Test Oli Trafo 11 sampel PT. Bambang Djaja Rp. 27,500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 20 July 2022 - Finish |
| Material Instalasi Gerbong KAI PT. Daya Raya Cipta Rp. 10,766,435 | Construction | JAWA TIMUR - KOTA SURABAYA | 07 July 2022 - Finish |
| Test Trafo Kirloskar PT. Master Steel Manufactory Rp. 120,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 01 July 2022 - Finish |
| Oil Purification Transformer PT. Master Steel Manufactory Rp. 62,610,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 25 June 2022 - On Going |
| Test Trafo Shenda PT. Master Steel Manufactory Rp. 120,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 25 June 2022 - Finish |
| Treatment Oil Trafo GSUT - Paiton PT. Graha Usaha Teknik Rp. 330,000,000 | Maintenance | JAWA TIMUR - KABUPATEN PROBOLINGGO | 25 June 2022 - Finish |
| Pengadaan Material Panel PT. Velacom Indonesia Rp. 37,754,850 | Pengadaan | JAWA TIMUR - KOTA SURABAYA | 24 June 2022 - On Going |
| Pengadaan Material Panel PT. Velacom Indonesia Rp. 825,860,300 | Pengadaan | JAWA TIMUR - KOTA SURABAYA | 14 June 2022 - Finish |
| Treatment Oil Trafo 2000 kVA & 2500 kVA PT. Pancaran Suara Citra Rp. 14,783,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 13 June 2022 - Finish |
| Test DGA oli trafo PT. CJI Pasuruan Rp. 130,000,000 | Maintenance | JAWA TIMUR - KABUPATEN PASURUAN | 08 June 2022 - Finish |
| Pengadaan Material Panel PT. Velacom Indonesia Rp. 579,357,500 | Pengadaan | JAWA TIMUR - KOTA SURABAYA | 03 June 2022 - Finish |
| Test DGA oli trafo & Water Content PT. Multi Daya Mitra Rp. 190,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 31 May 2022 - On Going |
| Filter Oil Transformer PT. AMERTA INDAH OTSUKA - Kejayan Factory Rp. 30,000,000 | Maintenance | JAWA TIMUR - KABUPATEN PASURUAN | 21 May 2022 - On Going |
| Test BDV Trafo PT. Pancaran Suara Citra Rp. 749,996 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 20 May 2022 - On Going |
| Filtering Oil Transformer offline PT. Ispatindo Rp. 80,050,098 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 19 May 2022 - Finish |
| Test Oil Trafo tegangan tembus & DGA PT. Emdeki Utama Rp. 3,800,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 11 May 2022 - Finish |
| Drain, Filling and Filter Trafo PT. Ispatindo Rp. 12,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 10 May 2022 - Finish |
| Filter Oil Transformer PT. Gresik Power Indonesia Rp. 30,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 28 April 2022 - On Going |
| Calibration Relay Siemens F22 PT. Gresik Power Indonesia Rp. 15,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 27 April 2022 - On Going |
| Filtering Oil Transformer offline PT. Ispatindo Rp. 12,000,433 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 25 April 2022 - On Going |
| Pemasangan Covinbox SKTT 150 kV Cikarang - Rajapaksi 2 PT. PLN (Persero) UIT JBT Unit Pelaksana Transmisi Rp. 257,452,376 | Electrical | - | 14 April 2022 - Finish |
| Test DGA oli trafo PT. Ispatindo Rp. 3,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 07 April 2022 - Finish |
| Filter Oil Transformer + Test DGA PT. Graha Usaha Teknik Rp. 240,000,000 | Electrical | KALIMANTAN SELATAN - KOTA BANJARMASIN | 04 April 2022 - Finish |
| Drain, Filling and Filter Trafo PT. Ispatindo Rp. 38,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 01 April 2022 - Finish |
| Test BDV Trafo PT. Hatni Rp. 500,000 | Maintenance | JAWA TIMUR - KABUPATEN LAMONGAN | 23 March 2022 - On Going |
| Sewa Peralatan Penunjang Stringing SUTT 150 kV PT. Hasta Karya Perdana Rp. 240,000,000 | Electrical | JAWA TIMUR - KOTA SURABAYA | 21 March 2022 - Finish |
| Treatment Oil dan test DGA PT. Hokkan Deltapack Industri Rp. 6,000,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 17 March 2022 - Finish |
| Treatment Oil dan test DGA PT. Sorini Towa Berlian Corporindo Rp. 15,000,000 | Maintenance | JAWA TIMUR - KABUPATEN PASURUAN | 15 March 2022 - Finish |
| Test DGA oli trafo & BDV PT. Sinar Angkasa Rungkut Rp. 500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 07 March 2022 - Finish |
| Treatment Oil Trafo 3 phase PT. Multi Makmur Indah Industri Rp. 3,800,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 27 February 2022 - On Going |
| Pekerjaan Civil Pemindahana Outlet PLTGU dari GIS Gresik ke GI Gresik Lama PT. Mahakaam Jaya Sejahtera Rp. 605,850,790 | Construction | JAWA TIMUR - KABUPATEN GRESIK | 22 September 2021 - Finish |
| Cleaning & Check Bolt Nut Equipment PT. CJI Jombang Rp. 94,000,000 | Construction | JAWA TIMUR - KABUPATEN JOMBANG | 22 September 2021 - Finish |
| Revisi Harga GITET Krian PT. Mahakaam Jaya Sejahtera Rp. 2,878,230,568 | Electrical | JAWA TIMUR - KABUPATEN MOJOKERTO | 01 September 2021 - Finish |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Multi Daya Mitra Rp. 4,600,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 21 August 2021 - On Going |
| Electrical Inspection Services PT. CJI Pasuruan Rp. 192,000,000 | Electrical | JAWA TIMUR - KABUPATEN PASURUAN | 18 August 2021 - On Going |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Multi Daya Mitra Rp. 4,600,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 12 August 2021 - Finish |
| Pemasangan GCB & DS PT. CJI Pasuruan Rp. 310,000,000 | Construction | JAWA TIMUR - KABUPATEN PASURUAN | 26 July 2021 - On Going |
| Site Test CT PT. ABB Power Grids Indonesia Rp. 7,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN PROBOLINGGO | 12 July 2021 - Finish |
| Sewa Alat Erection & Stringing 150 KV PT. Guna Sarana Teknik Rp. 200,000,000 | Electrical | KALIMANTAN TENGAH - KOTA PALANGKA RAYA | 29 June 2021 - On Going |
| Infra Red Thermograph PT. Gloster Furniture Rp. 1,500,000 | Testing & Commissioning | SULAWESI SELATAN - KABUPATEN JENEPONTO | 18 June 2021 - Finish |
| Treatment Oil Trafo 800 kVA & Cleaning Cubicle DHL Rungkut SIER Rp. 8,300,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 17 June 2021 - Finish |
| Uji Minyak Trafo 30 sampel acidity PT. Bambang Djaja Rp. 10,500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 16 June 2021 - Finish |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Bambang Djaja Rp. 27,500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 16 June 2021 - Finish |
| Jasa Contact Resistant PT. Semen Indonesia PT. Buana Cahayatama Rp. 7,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 06 June 2021 - Finish |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Purnama Indonesia Rp. 300,000 | Maintenance | NUSA TENGGARA BARAT - KOTA MATARAM | 27 May 2021 - On Going |
| Hydraulic Oil Test PT. Siemens Gamesha Renewable Energy Rp. 2,100,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 25 May 2021 - On Going |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Purnama Indonesia Rp. 1,200,000 | Maintenance | NUSA TENGGARA BARAT - KOTA MATARAM | 24 May 2021 - On Going |
| Pengambilan sampel oil trafo PT. Petrolab Services Rp. 1,500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 07 May 2021 - Finish |
| Test Oli Trafo (BDV, DGA, WC) PT. Purnama Indonesia Rp. 7,200,000 | Maintenance | NUSA TENGGARA BARAT - KOTA MATARAM | 04 May 2021 - Finish |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Purnama Indonesia Rp. 7,200,000 | Testing & Commissioning | NUSA TENGGARA BARAT - KOTA MATARAM | 04 May 2021 - Finish |
| Testing Electrical Work PT. Taihei Dengyo Indonesia Rp. 100,000,000 | Electrical | JAWA TENGAH - KABUPATEN JEPARA | 30 April 2021 - Finish |
| Test DGA oli trafo PT. Siemens Gamesha Renewable Energy Rp. 1,500,000 | Maintenance | SULAWESI SELATAN - KABUPATEN JENEPONTO | 23 April 2021 - On Going |
| Sewa sling Bigbone 18 mm PT. Sangkan Jaya Rp. 40,000,000 | Sewa Alat | RIAU - KABUPATEN PELALAWAN | 09 April 2021 - Finish |
| Maintenance GI 150 kV Substation PT. Ispatindo Rp. 60,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 31 March 2021 - On Going |
| Test DGA oli trafo + Tegangan Tembus PT. Emdeki Utama Rp. 3,800,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 31 March 2021 - On Going |
| Test DGA oli trafo + Furan PT. Jatim Taman Steel Rp. 3,400,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 28 March 2021 - On Going |
| Test Oil Trafo (DGA, BDV,Water Content ) + Keasaman dan Warna PT. Utomo Juragan Atap Surya Indonesia Rp. 2,500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 23 March 2021 - On Going |
| Treatment Oil Trafo 1000 kVA dan Penggantian Packing Gedung Keuangan Negara Indrapura Rp. 6,650,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 06 March 2021 - Finish |
| Preventive Maintenance Trafo PLTG Amurang PT. Enha Duta Econsindo Rp. 30,000,000 | Maintenance | SULAWESI UTARA - KABUPATEN MINAHASA | 03 March 2021 - Finish |
| sewa mesin Lancier PT. Listrik Sarana Jabar Rp. 71,000,000 | Construction | JAWA TENGAH - KOTA SEMARANG | 01 March 2021 - Finish |
| Test BDV Trafo PT. Pancaran Suara Citra Rp. 549,995 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 18 February 2021 - Finish |
| Pekerjaan Civil IBT 5 sisi 500 kV untuk GITET Krian PT. Mahakaam Jaya Sejahtera Rp. 2,388,926,573 | Construction | JAWA TIMUR - KABUPATEN MOJOKERTO | 07 February 2021 - Finish |
| Sewa Tangki 16000 ltr PT. Wisma Tata Eltra Perkasa Rp. 4,000,000 | Sewa Alat | JAWA TIMUR - KABUPATEN SIDOARJO | 20 January 2021 - On Going |
| Sewa Tangki 16000 ltr CV. Crossindo Teknik Rp. 4,500,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 20 January 2021 - On Going |
| Ganti Oli dan Treatment Oli Trafo PT. Mahakaam Jaya Sejahtera Rp. 54,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 02 January 2021 - Finish |
| Pengadaan dan Pemasangan NCT RingTrafo PT. PLN (Persero) UPT Surabaya Rp. 32,350,260 | Construction | JAWA TIMUR - KABUPATEN SIDOARJO | 21 December 2020 - On Going |
| Penggelaran Kabel Power Trafo#5 PT. PLN (Persero) UPT Surabaya Rp. 47,280,690 | Construction | JAWA TIMUR - KABUPATEN SIDOARJO | 21 December 2020 - On Going |
| Maintenance of NGR PT. Gresik Power Indonesia Rp. 38,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 14 November 2020 - Finish |
| Treatment Oil Trafo 2 unit PT. Mitra Purnama Engineering Rp. 390,000,000 | Maintenance | JAWA BARAT - KABUPATEN KARAWANG | 02 November 2020 - Finish |
| Treatment Oil Trafo PT. Marufuji Kenzai Indonesia Rp. 6,700,000 | Maintenance | JAWA TIMUR - KABUPATEN MOJOKERTO | 23 October 2020 - On Going |
| Test DGA oli trafo PT. CJI Jombang Rp. 2,500,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN JOMBANG | 14 October 2020 - Finish |
| Sewa mesin puller PT. Hasta Prajatama Rp. 115,000,000 | Electrical | JAWA TIMUR - KABUPATEN PROBOLINGGO | 28 September 2020 - On Going |
| Uji Transformator (Rasio, WR,TD,Insulator Resistance) PT. Unggul Pawenang Sentosa Rp. 18,000,000 | Testing & Commissioning | JAWA BARAT - KABUPATEN BOGOR | 26 September 2020 - On Going |
| Pengetesan Oli PT. Bambang Djaja Rp. 800,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 23 September 2020 - On Going |
| Uji Transformator (Rasio, WR,TD,Insulator Resistance) PT. Unggul Pawenang Sentosa Rp. 20,000,000 | Testing & Commissioning | JAWA BARAT - KABUPATEN BOGOR | 22 September 2020 - On Going |
| Uji Laboratorium DGA 2 sampel PT. Umas Jaya Agrotama Rp. 2,250,000 | Testing & Commissioning | SUMATERA SELATAN - KOTA PALEMBANG | 04 September 2020 - Finish |
| Sewa Roller Cable PT. Graha Usaha Teknik Rp. 1,500,000 | Electrical | DKI JAKARTA - KOTA JAKARTA SELATAN | 26 August 2020 - On Going |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Multi Daya Mitra Rp. 4,600,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 24 August 2020 - On Going |
| Duct Kabel Power Trafo#5 PT. PLN (Persero) UPT Surabaya Rp. 66,255,799 | Construction | JAWA TIMUR - KABUPATEN SIDOARJO | 12 August 2020 - Finish |
| SAT Trafo GIS Ngagel PT. Kentjana Sakti Rp. 32,000,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 29 July 2020 - On Going |
| Pengambilan sampel oil trafo PT. Petrolab Services Rp. 1,200,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 23 July 2020 - On Going |
| Purifikasi Trafo 3 unit Universitas Ciputra Rp. 8,550,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 22 July 2020 - On Going |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Emdeki Utama Rp. 7,600,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 20 July 2020 - Finish |
| Transformer Inspection PT. ABB Power Grids Indonesia Rp. 15,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN SIDOARJO | 12 July 2020 - Finish |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Siemens Gamesha Renewable Energy Rp. 8,000,000 | Maintenance | SULAWESI SELATAN - KABUPATEN JENEPONTO | 30 June 2020 - Finish |
| Moisture & BDV Parameter PT. Siemens Gamesha Renewable Energy Rp. 3,200,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN MOJOKERTO | 30 June 2020 - Finish |
| Test DGA oli trafo PT. Sorini Towa Berlian Corporindo Rp. 9,000,000 | Maintenance | JAWA TIMUR - KABUPATEN PASURUAN | 24 June 2020 - On Going |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Multi Daya Mitra Rp. 2,300,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 22 June 2020 - On Going |
| Transformer Oil Purification at Tambak Lorok Power Semarang PT. Graha Usaha Teknik Rp. 580,000,000 | Electrical | JAWA TENGAH - KABUPATEN SEMARANG | 18 June 2020 - On Going |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Multi Daya Mitra Rp. 2,300,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 24 April 2020 - On Going |
| Instal Bay Trafo #C 35 MVA TT 150 kV PT. Sigma Tirta Surya Rp. 5,550,000,000 | Electrical | JAWA TIMUR - KABUPATEN PASURUAN | 23 April 2020 - Finish |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Multi Daya Mitra Rp. 4,600,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 20 April 2020 - Finish |
| Hipot Test Kabel HV CV. Tiga Bintang Rp. 5,500,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN JOMBANG | 20 April 2020 - Finish |
| Service Cost of Power Metering Power Plan PT. Gresik Power Indonesia Rp. 12,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 17 April 2020 - Finish |
| Test DGA oli trafo PT. Ispatindo Rp. 3,000,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 15 April 2020 - Finish |
| Uji Laboratorium DGA 16 sampel PT. Petrolab Services Rp. 7,875,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 06 April 2020 - Finish |
| Replace Oil OLTC Transformer 20 kV & Oil Purifying PT. Gresik Power Indonesia Rp. 22,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 26 March 2020 - On Going |
| Pengadaan dan Pemasangan NCT RingTrafo#1 GIS Kupang PT. PLN (Persero) UPT Surabaya Rp. 10,774,260 | Construction | JAWA TIMUR - KOTA SURABAYA | 20 March 2020 - Finish |
| Purifying & Vacuum Oil Transformer PT. Graha Usaha Teknik Rp. 120,000,000 | Maintenance | JAWA TIMUR - KABUPATEN PROBOLINGGO | 09 March 2020 - Finish |
| Purifying Oil Transformer 50 MVA PT. Electest Services Indonesia Rp. 140,000,000 | Maintenance | JAWA BARAT - KABUPATEN PURWAKARTA | 02 March 2020 - Finish |
| Uji SFRA Trafo 1 unit 7/8 Paiton PT. Graha Usaha Teknik Rp. 15,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN PROBOLINGGO | 12 February 2020 - Finish |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Pancaran Suara Citra Rp. 4,800,000 | Maintenance | JAWA TIMUR - KOTA SURABAYA | 10 February 2020 - Finish |
| Assembling and Treatment Oil Trafo PT. Ispatindo Rp. 16,500,000 | Maintenance | JAWA TIMUR - KABUPATEN SIDOARJO | 07 February 2020 - Finish |
| Pekerjaan infrared Thermography PT. Petrowidada Rp. 2,300,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 30 January 2020 - On Going |
| Inspeksi Infrared Thermography PT. Pancaran Suara Citra Rp. 6,600,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 20 January 2020 - On Going |
| Penggantian Trafo 70/20 kV GI Pare PT. PLN (Persero) UIT JBT Unit Pelaksana Transmisi Rp. 149,133,017 | Electrical | JAWA TIMUR - KOTA SURABAYA | 14 January 2020 - On Going |
| Repair Leakage of OLTC 876 Ternate PT. Unelec Indonesia ( UNINDO ) Rp. 30,000,000 | Construction | MALUKU UTARA - KOTA TERNATE | 14 January 2020 - Finish |
| Instalasi & SAT GI Namlea PT. Bambang Djaja Rp. 350,000,000 | Electrical | MALUKU UTARA - KABUPATEN PULAU MOROTAI | 06 January 2020 - Finish |
| Instalasi & SAT GI Namrole PT. Bambang Djaja Rp. 325,000,000 | Electrical | MALUKU UTARA - KABUPATEN HALMAHERA BARAT | 06 January 2020 - Finish |
| Instalasi & SAT GI Malifut PT. Bambang Djaja Rp. 325,000,000 | Electrical | MALUKU UTARA - KABUPATEN HALMAHERA BARAT | 06 January 2020 - On Going |
| TAR-PST.04 ST#2 Calibration Relay M3420 PT. Gresik Power Indonesia Rp. 18,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN GRESIK | 08 August 2019 - Finish |
| Test Oil Trafo (DGA, BDV,Water Content ) PT. Asian Profile Indosteel Rp. 1,700,000 | Testing & Commissioning | JAWA TIMUR - KOTA SURABAYA | 08 August 2019 - Finish |
| Jasa Instalasi GIS Cilacap PT. Buanareksa Binaperkasa Rp. 320,000,000 | Electrical | JAWA TENGAH - KABUPATEN CILACAP | 11 March 2019 - On Going |
| Sewa Vacuum Trafo PT. PP (Persero) Tbk. Rp. 77,000,000 | Sewa Alat | PAPUA - KABUPATEN MERAUKE | 01 March 2019 - Finish |
| Moving GIS Gunungsari PT. Hitachi Power System Indonesia Rp. 210,000,000 | Construction | JAWA TIMUR - KOTA SURABAYA | 18 February 2019 - Finish |
| Current Injector 4 Relay & Contact Resistant CV. Abadi Buana Powerindo Rp. 6,000,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN SIDOARJO | 15 February 2019 - Finish |
| Treatment Oil Trafo 250 kVA PT. Malindo Gresik Rp. 6,800,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 27 January 2019 - On Going |
| Test DGA oli trafo 250 kVA PT. Unelec Indonesia ( UNINDO ) Rp. 4,000,000 | Maintenance | JAWA TIMUR - KABUPATEN GRESIK | 19 January 2019 - Finish |
| Pemasangan Peralatan Elektromekanik GI 150 kV Sintang PT. Buanareksa Binaperkasa Rp. 1,200,000,000 | Electrical | KALIMANTAN BARAT - KABUPATEN SINTANG | 01 January 2019 - On Going |
| Sewa Secondary Injector di PT. Petrokimia CV. Abadi Buana Powerindo Rp. 10,500,000 | Sewa Alat | JAWA TIMUR - KABUPATEN GRESIK | 01 January 2019 - Finish |
| Laying Cable Pertamina Cilacap PT. Buanareksa Binaperkasa Rp. 1,971,346,000 | Electrical | JAWA TENGAH - KABUPATEN CILACAP | 10 December 2018 - On Going |
| Pembangunan Interkoneksi Kabel Laut 20 kV 3 Gili, Lombok NTB PT. PLN (Persero) Wilayah NTB Rp. 66,300,467,550 | Electrical | NUSA TENGGARA BARAT - KOTA MATARAM | 15 March 2018 - On Going |
| Pembangunan GI PLTG Duri berikut Incomer 150 kV PT. PLN (Persero) P3B Sumatra Rp. 20,809,001,192 | Electrical | SUMATERA BARAT - KOTA PADANG | 10 January 2012 - On Going |
| Pekerjaan Saluran Air di Santos Grati PT. Raga Perkasa Ekaguna Rp. 528,165,000 | Civil | JAWA TIMUR - KABUPATEN PASURUAN | 07 September 2011 - On Going |
| Inspeksi Peralatan Relay Proteksi, Transformer PT. Pertamina Geothermal Energy Rp. 697,056,250 | Testing & Commissioning | JAWA BARAT - KABUPATEN BANDUNG | 07 September 2011 - On Going |
| Replacement OLTC of IBT New Balaraja 500 kV Including tools PT. Alstom Grid Rp. 341,000,000 | Electrical | DKI JAKARTA - KOTA JAKARTA BARAT | 17 August 2011 - Finish |
| Erection & Commissioning 150 kV Ulubelu Geothermal Power Plant PT. Siemens Gamesha Renewable Energy Rp. 2,633,920,300 | Electrical | SUMATERA SELATAN - KOTA PALEMBANG | 16 August 2011 - On Going |
| Supply of Installation and Commissioning Timor Leste Substation ABB Sakti Industri Rp. 584,170 | Electrical | DKI JAKARTA - KOTA JAKARTA SELATAN | 05 August 2011 - Finish |
| Pengadaan dan Pemasangan Trafo IBT ke II 500/150 kV - 500 MVA PT. PLN (Persero) P3B Region Jawa Timur dan Bali Rp. 4,835,516,000 | Electrical | JAWA TIMUR - KABUPATEN PASURUAN | 07 April 2011 - Finish |
| Site Erection, Testing & Commissioning IBT 500 kV Kembangan PT. Central Multi Teknindo Rp. 825,000,000 | Electrical | DKI JAKARTA - KOTA JAKARTA BARAT | 25 March 2011 - On Going |
| Pekerjaan Jasa Terminasi Proyek Chevron Duri PT. Persada Engineering & Contracting Rp. 1,166,000,000 | Electrical | RIAU - KOTA D U M A I | 15 March 2011 - On Going |
| Terminasi Kabel XLPE 150 kV (CU XLPE 1 x 1600 Sqmm ) GIS 150 kV Tanjung Priok PT. Persada Engineering & Contracting Rp. 297,000,000 | Electrical | DKI JAKARTA - KOTA JAKARTA UTARA | 27 January 2011 - On Going |
| Erection, Testing & Commissioning for 17 Power Transformer PT. CG Power Systems Indonesia Rp. 1,851,008,500 | Electrical | JAWA BARAT - KABUPATEN BOGOR | 10 January 2011 - Finish |
| Erection Gardu Induk Gandul Trafo 500/150 kV berikut Bay Trafo GITET PT. Meta Epsi Rp. 1,183,297,500 | Electrical | JAWA BARAT - KABUPATEN BOGOR | 23 December 2010 - On Going |
| Pengadaan Sealing End dan Jumpering sementara dengan Kabel XLPE PT. Elementarika Nusantara Rp. 521,400,000 | Electrical | JAWA BARAT - KOTA BEKASI | 11 January 2010 - Finish |
| Pembangunan Kabel Penghantar 20 kV Interkoneksi PLTU Ternate - Tidore PT. PLN ( Persero ) Sulmapa Rp. 6,669,542,000 | Electrical | MALUKU UTARA - KOTA TERNATE | 21 December 2009 - Finish |
| Pembangunan Gardu Induk 150 kV Batulicin PT. PLN Pikitring Kaltim Rp. 32,061,370,000 | Electrical | KALIMANTAN TIMUR - KOTA BALIKPAPAN | 08 December 2009 - Finish |
| Pemasangan Outdoor Sealing End Kabel XLPE 1200 mm2 PT. Kabel Metal Internusa Rp. 594,000,000 | Electrical | JAWA BARAT - KABUPATEN BOGOR | 01 December 2009 - Finish |
| Dismantling, Erection dan Commissioning Assistance 500/150 kV 3 phase IBT PT. Areva T & D Rp. 1,870,000,000 | Electrical | BANTEN - KOTA TANGERANG | 23 November 2009 - Finish |
| Pulling Cable 150 kV XLPE Power Cable GIS Teling PT. Meta Epsi Rp. 1,283,348,000 | Electrical | SULAWESI UTARA - KOTA MANADO | 16 October 2009 - On Going |
| Erection and Commissioning IBT Assembly 500 kV at New Kediri PT. Areva T & D Rp. 550,000,000 | Electrical | JAWA TIMUR - KABUPATEN KEDIRI | 31 August 2009 - Finish |
| Jasa Pengujian Minyak Trafo (DGA) dan Thermovision PT. PLN (Persero) Jasa Sertifikasi Rp. 294,250,000 | Electrical | SUMATERA UTARA - KOTA MEDAN | 27 July 2009 - On Going |
| Jasa Sertifikasi Laik Operasi untuk Jaringan Listrik Pedesaan Pemkab Blitar Rp. 123,640,000 | Electrical | JAWA TIMUR - KABUPATEN BLITAR | 15 July 2009 - Finish |
| Testing and Commissioning GI Botupinge Gorontalo PT. Merapi Trans Energi Rp. 396,000,000 | Testing & Commissioning | GORONTALO - KOTA GORONTALO | 08 June 2009 - Finish |
| Rental of High Voltage Tester and primary secondary injection PT. Rekayasa Industri Rp. 505,833,328 | Electrical | KEPULAUAN RIAU - KOTA B A T A M | 03 April 2009 - Finish |
| Relay Protection & Test PT. Rekayasa Industri Rp. 123,000,000 | Electrical | KEPULAUAN RIAU - KOTA B A T A M | 21 February 2009 - Finish |
| Jaringan Transmisi 150 kV Asam-asam & Batulicin PT. PLN Pikitring Kaltim Rp. 19,501,779,550 | Electrical | KALIMANTAN TIMUR - KOTA BALIKPAPAN | 01 January 2009 - On Going |
| Primary & Secondary Injection Saturasi, Rasio & Contact PT. Rekayasa Industri Rp. 134,600,000 | Electrical | SULAWESI UTARA - KOTA TOMOHON | 28 October 2008 - Finish |
| Primary & Secondary Injection Saturasi, Rasio & Contact PT. Rekayasa Industri Rp. 121,000,000 | Electrical | SULAWESI UTARA - KOTA TOMOHON | 29 August 2008 - Finish |
| Pemasangan Material Elektromekanik 2 Line Bay 150 kV dan Komisioning PT. PLN Pikitring Kaltim Rp. 2,939,127,000 | Electrical | KALIMANTAN TIMUR - KOTA BALIKPAPAN | 02 July 2008 - On Going |
| Pengadaan dan Pemasangan Sirkit ke 2 SUTT 150 kV Gilimanuk Pemaron PT. PLN (Persero) P3B Region Jawa Timur dan Bali Rp. 41,110,573,790 | Electrical | BALI - KABUPATEN BADUNG | 18 February 2008 - Finish |
| Pengadaan dan Pemasangan Trafo Distribusi 150/20 kV 80 MVA untuk GI Kapal dan Pemasangan Trafo 30 MVA eks GI Kapal berikut PT. PLN (Persero) P3B Region Jawa Timur dan Bali Rp. 14,379,357,000 | Electrical | BALI - KABUPATEN JEMBRANA | 18 February 2008 - Finish |
| Pembangunan Sarana dan Prasarana PON XVII Kutai Kartanegara Pemkab Kutai Kartanegara Rp. 48,859,704,000 | Electrical | KALIMANTAN TIMUR - KABUPATEN KUTAI KARTANEGARA | 11 December 2007 - Finish |
| Pembangunan 2 Line Bay + Trafo Bay + Trafo 1 x 30 MVA GI 150 kV Amuntai PT. PLN Pikitring Kaltim Rp. 26,010,046,000 | Electrical | KALIMANTAN TIMUR - KOTA BALIKPAPAN | 16 July 2007 - Finish |
| Maintenance GI 150 kV Substation Kamojang ABB Sakti Industri Rp. 316,421,857 | Electrical | JAWA BARAT - KABUPATEN GARUT | 26 April 2007 - On Going |
| Pembangunan Extension 1 Trafo Bay + Trafo 150/20 kV ; 1 x 30 MVA GI Mantul dan Uprating Trafo 150/20 kV GI Asam-Asam PT. PLN Pikitring Kaltim Rp. 16,721,491,000 | Electrical | KALIMANTAN TIMUR - KOTA BALIKPAPAN | 15 December 2006 - Finish |
| Pengembangan Jaringan Listrik PLN di dusun terpencil Situbondo ESDM Propinsi Jawa Timur Rp. 5,820,800,700 | Electrical | JAWA TIMUR - KABUPATEN SITUBONDO | 20 September 2006 - Finish |
| Installation 150 kV for New Transformer PT. CJI Pasuruan Rp. 413,600,000 | Electrical | JAWA TIMUR - KABUPATEN PASURUAN | 09 June 2006 - Finish |
| Tjiwi Kimia testing and Commissioning ABB Sakti Industri Rp. 627,159,000 | Testing & Commissioning | JAWA TIMUR - KABUPATEN MOJOKERTO | 07 June 2006 - On Going |
| Pulling Cable 150 kV XLPE Power Cable Proyek Lot III Musi HEPP Bengkulu PT. Meta Epsi Rp. 397,870,000 | Electrical | SUMATERA SELATAN - KOTA PRABUMULIH | 14 November 2005 - On Going |
| Erection Work for GI Surya Cipta Project PT. Vatech Trans Rp. 231,000,000 | Electrical | JAWA BARAT - KABUPATEN KARAWANG | 14 September 2005 - Finish |
| Pembangunan Gardu Induk 70 kV Talise PT. PLN Wilayah Sulutenggo Rp. 13,453,697,000 | Electrical | SULAWESI UTARA - KOTA MANADO | 14 September 2005 - Finish |
| Relokasi Tower SUTT Duri Kosambi Baru Jatirangon dan Ganda Mekar MM2100 Industrial Town Rp. 4,300,000,000 | Electrical | DKI JAKARTA - KOTA JAKARTA TIMUR | 18 March 2005 - Finish |
| Pemasangan Peralatan Elektromekanik GI 150 kV Kuala Kapuas PT. PLN Pikitring Kaltim Rp. 741,840,000 | Electrical | KALIMANTAN TIMUR - KOTA SAMARINDA | 09 March 2005 - Finish |
| Pembangunan Pondasi S/Y 150 kV Cable Duct dan Peralatan E/M PT. PLN Pikitring Kaltim Rp. 11,832,517,000 | Electrical | KALIMANTAN TIMUR - KOTA BALIKPAPAN | 07 June 2004 - Finish |
| Erection 500 kV/150 kV Tasikmalaya S/S PT. Cita Contract Rp. 1,007,615,000 | Electrical | JAWA BARAT - KABUPATEN TASIKMALAYA | 21 April 2004 - Finish |
| Pemasangan Peralatan GI 150 kV Pemaron PT. Truba Jurong Engineering Rp. 94,500,000 | Electrical | BALI - KABUPATEN BADUNG | 10 January 2004 - Finish |
| Pembongkaran Trafo Lama dan Pemasangan Trafo Baru PT. Master Steel Manufactory Rp. 157,886,000 | Electrical | JAWA TIMUR - KABUPATEN GRESIK | 04 January 2004 - On Going |
| Penerangan Jalan Umum di wilayah Kabupaten Sidoarjo Pemkab Sidoarjo Rp. 47,570,090,000 | Electrical | JAWA TIMUR - KABUPATEN SIDOARJO | 31 December 2003 - Finish |
| Erection 2 OHL 500 kV Muara Tawar and Supervisi for Testing Comm PT. Vatech Trans Rp. 208,490,000 | Electrical | DKI JAKARTA - KOTA JAKARTA UTARA | 18 December 2003 - On Going |
| Pekerjaan Pemasangan dan Pengadaan Peralatan GI 150 kV PT. Adiquatro Elektrik Rp. 215,000,000 | Electrical | KALIMANTAN SELATAN - KOTA BANJARMASIN | 13 November 2003 - On Going |
| Erection Equipment for Main Transformer 156.8 MVA 150 kV PT. Wasamitra Engineering Rp. 150,000,000 | Electrical | BALI - KABUPATEN BADUNG | 12 November 2003 - Finish |
| Erection Work for GITET 500 kV Equipment at Ungaran PT. Vatech Trans Rp. 217,466,000 | Electrical | JAWA TENGAH - KABUPATEN SEMARANG | 12 September 2003 - Finish |
| Erection Work GIS Mampang 150 kV Extention PT. Aryasada Rp. 110,000,000 | Electrical | DKI JAKARTA - KOTA JAKARTA SELATAN | 18 July 2002 - On Going |
| Civil Works & Erection for 150 kV PT. PLN (Persero) P3B Region Jawa Timur dan Bali Rp. 490,001,000 | Electrical | BALI - KOTA DENPASAR | 02 March 2002 - On Going |
| Pekerjaan Penarikan Circuit ke II SUTT 150 kV PT. PLN (Persero) UIT JBT Unit Pelaksana Transmisi Rp. 1,903,095,000 | Electrical | JAWA TIMUR - KABUPATEN BANGKALAN | 27 December 2001 - On Going |
| Pengadaan dan Pemasangan Kapasitor 150 kV PT. Siemens Gamesha Renewable Energy Rp. 246,836,000 | Electrical | JAWA TIMUR - KABUPATEN TUBAN | 01 May 2001 - On Going |
| Power Development and Efficiency Enhancement Project Power XXV PT. Schneider Electric Rp. 331,269,000 | Electrical | SUMATERA SELATAN - KOTA PALEMBANG | 27 March 2001 - On Going |
| Civil Works for Makale & Palopo 150 kV Substation PT. Schneider Electric Rp. 3,932,364,000 | Civil | SULAWESI SELATAN - KOTA PALOPO | 27 December 1999 - Finish |
| Electrical Work for Pulomas Substation PT. Hitachi Sakti Energy Indonesia Rp. 527,000,000 | Electrical | DKI JAKARTA - KOTA JAKARTA PUSAT | 01 November 1997 - On Going |
| Electrical Work for New Cawang Substation PT. Hitachi Sakti Energy Indonesia Rp. 451,000,000 | Electrical | DKI JAKARTA - KOTA JAKARTA PUSAT | 01 June 1997 - On Going |
| Electrical Work Duren Tiga Substation PT. Hitachi Sakti Energy Indonesia Rp. 407,000,000 | Electrical | DKI JAKARTA - KOTA JAKARTA PUSAT | 15 May 1997 - On Going |
| Proyek Konsumen Besar Jawa Timur GIS Waru & Tandes PT. PLN (Persero) P3B Region Jawa Timur dan Bali Rp. 247,500,000 | Electrical | JAWA TIMUR - KOTA SURABAYA | 13 July 1995 - On Going |
| Proyek Konsumen Besar Jawa Timur GIS Bangil & Karangpilang PT. PLN (Persero) P3B Region Jawa Timur dan Bali Rp. 3,003,761,196 | Electrical | JAWA TIMUR - KOTA SURABAYA | 10 February 1994 - Finish |
| Erection Work for 150 kV Tanjung Priok PT. Hitachi Sakti Energy Indonesia Rp. 849,200,000 | Electrical | DKI JAKARTA - KOTA JAKARTA UTARA | 08 March 1993 - Finish |